Drug tunnel used more than 6 months
1 of 5
The main entrance to the alleged drug tunnel found Saturday morning in San Luis Rio Colorado. The first section is a small corridor leading to another entrance to the main part of the tunnel, almost 60 feet deep.
Photo courtesy of Secretaria de la Defensa Nacional (SEDENA)
Drug tunnel used more than 6 months.
SAN LUIS RIO COLORADO, Son. — A half-block from the Mexican port of entry and a few feet from the border is where authorities discovered a tunnel that crosses into a commercial facility in San Luis, Ariz.About 755 feet long and 60 feet deep, the tunnel would have been used for m.
Read Drug tunnel used more than 6 months...